Manufacturing Methods and Technology Program for Ruggedized Tactical Fiber Optic Cable.

Abstract

The scope of this quarter's effort, as reported herein, includes the following tasks and achievements: (1) Cable Process Optimization; (a) Complete polyurethane jacket evaluation samples (four types, four manufacturers), (b) Complete fungus testing, (c) Select optimized polyurethane type, (d) Begin optimized cable fabrication for third engineering sample, (e) Deliver second engineering sample and test report (lay length and polyurethane evaluation samples); (2) Use of Facilities; (a) Achieve 75% of production rate on the high speed strander, (b) Install new Kevlar serving line, start setting up, and make operational, (c) complete extruder set up and work toward 0.8 h/km rate, (d) Set up and make spooler operational, achieve 50% production rate, (e) Assemble test stations and characterize; and (3) Secondary Performance Milestones; (a) Achieve 0.5 dB/km induced attenuation from cabling operation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 26, 1980
Accession Number
ADA086874

Entities

People

  • R. J. Hoss
  • R. Kopstein

Tags

Communities of Interest

  • Advanced Electronics
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Circuit Boards
  • Communication Systems
  • Detection
  • Detectors
  • Electrical Engineering
  • Electronic Equipment
  • Engineering
  • Engineers
  • Fabrication
  • Fiber Optics
  • Manufacturing
  • Materials
  • Optical Fibers
  • Plastic Explosives
  • Production
  • Production Rate

Readers

  • Optical Fiber Sensing and Electromagnetic Propagation.
  • Polymer Science and Engineering.
  • Software Engineering