National Dam Safety Program. Green Turtle Pond Dam (NJ00190), Passaic River Basin, Branch of Wanaque River, Passaic County, New Jersey. Phase I Inspection Report.

Abstract

This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1980
Accession Number
ADA087328

Entities

People

  • John P. Talerico

Organizations

  • New Jersey Department of Environmental Protection

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Environmental Protection
  • Gate Valves
  • Gates
  • Materials
  • New Jersey
  • Plastic Explosives
  • Safety
  • Stilling Basins
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.