National Dam Safety Program. Whitehead Dam (NJ00559), Delaware River Basin, Assunpink Creek, Mercer County, New Jersey. Phase I Inspection Report.

Abstract

This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1980
Accession Number
ADA088041

Entities

People

  • Rudolph Wrubel

Organizations

  • New Jersey Department of Environmental Protection

Tags

DTIC Thesaurus Topics

  • Construction
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Environmental Protection
  • Flood Control
  • Flood Hazards
  • Flood Plains
  • Floods
  • New Jersey
  • Organic Materials
  • Plastic Explosives
  • Riprap
  • Visual Inspection
  • Warning Systems
  • Water Resources

Readers

  • Hydrologic Risk Analysis and Mitigation.