Greenland Ice Sheet Program. 1979. Phase 1. Casing Operation.
Abstract
A modified CRREL thermal drill was used at DYE-3 in Greenland to drill a 8.75-in.-diameter hole 251 ft deep for the installation of a steel casing. This activity was accomplished by a drill team from CRREL in preparation for the Danish deep drill tests. Included in this report is a description of both the drilling and casing operation as well as a description of the equipment used. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1980
- Accession Number
- ADA089699
Entities
People
- John Rand
Organizations
- Cold Regions Research and Engineering Laboratory