Boston Harbor, Massachusetts Main Report for Debris Removal. Volume I. Revision.

Abstract

This study determined the engineering feasibility and environmental acceptability in removal and disposal of floatable debris from Boston Harbor. A total of 533 waterfront structures were found to be sources of debris. The total volume of floatable debris and non-floatable material from these sources is estimated to be about 3.2 million cubic feet and 4,500 tons, respectively. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1980
Accession Number
ADA092396

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Air Pollution
  • Birds
  • Business Administration
  • Commerce
  • Economic Analysis
  • Economic Development
  • Employment
  • Environment
  • Environmental Protection
  • Fish
  • Habitats
  • Health Services
  • Industrial Plants
  • Shipbuilding
  • United States Government
  • Water Pollution
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering