Boston Harbor, Massachusetts Feasibility Report for Debris Removal. Volume 2. Part A-Debris Inventory. Summary Sheets. Part B - Land Enhancement. Summary Sheets. Revision.
Abstract
This study determined the engineering feasibility and environmental acceptability of removal and disposal of floatable debris from Boston Harbor. A total of 533 waterfront structures were found to be sources of debris. The total volume of floatable debris and non-floatable material from these sources is estimated to be about 3.2 million cubic feet and 4,500 tons, respectively. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1980
- Accession Number
- ADA092397
Entities
Organizations
- New England District, U.S. Army Corps of Engineers