Boston Harbor, Massachusetts Feasibility Report for Debris Removal. Volume 2. Part A-Debris Inventory. Summary Sheets. Part B - Land Enhancement. Summary Sheets. Revision.

Abstract

This study determined the engineering feasibility and environmental acceptability of removal and disposal of floatable debris from Boston Harbor. A total of 533 waterfront structures were found to be sources of debris. The total volume of floatable debris and non-floatable material from these sources is estimated to be about 3.2 million cubic feet and 4,500 tons, respectively. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1980
Accession Number
ADA092397

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Birds
  • Construction
  • Engineers
  • Environment
  • Environmental Protection
  • Fish
  • Geography
  • Habitats
  • Health Services
  • Marine Transportation
  • Medical Personnel
  • Natural Resources
  • New England
  • Recreation
  • Shipbuilding
  • United States
  • Wildlife

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering