Propelling Charge Container Leakage Inspection.
Abstract
A general overview of the parameters associated with propelling charge container leakage inspection is presented. Empirical methods and computer techniques for determining parameter values and equipment settings were developed and verified by laboratory testing. The equipment requirements and setup procedure for an automated LAP line application are outlined, and the effects of manufacturing variations are discussed. The requirements for acceptance standards are addressed, and considerations for additional and future applications are presented.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1980
- Accession Number
- ADA093481
Entities
People
- Michael J. Goes
Organizations
- United States Army Armament Research, Development and Engineering Center