Type II Forward Storage Site Facilities: POMCUS System. Volume 2.

Abstract

This two-volume report provides comprehensive generic information for the design and construction of future Prepositioned Materiel Configured to Unit Sets (POMCUS) installations, with specific attention to: (1) The particular facility requirements of POMCUS installation user/occupants in accomplishing the storage, maintenance, and issue functions. (2) The military threats and vulnerabilities. (3) The NATO construction funding justification provisions. (4) The lessons learned from the daily operations and Return of Forces to Germany (REFORGER) exercises occurring on the existing Combat Equipment Group-Europe (CEGE) sites. Information in this report was compiled from three sources relevant to the decision-making process: (1) supplies and equipment data, (2) Army and Congressional literature, and (3) the experience and knowledge of CEGE personnel. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1980
Accession Number
ADA093672

Entities

People

  • Robert L. Porter

Organizations

  • Construction Engineering Research Laboratory

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Armored Personnel Carriers
  • Command And Control
  • Construction
  • Construction Materials
  • Control Systems
  • Detectors
  • Dry Batteries
  • Fire Protection
  • Geography
  • Internal Combustion Engines
  • Logistics
  • Maintenance
  • Materials Handling Equipment
  • Materials Processing
  • Plastic Explosives
  • Repair Shops
  • Warning Systems

Readers

  • Library and Information Science
  • Maritime Combat Support and Expeditionary Logistics.
  • Nuclear Civil Defense.