Cost Analysis of Light Water Reactor Power Plants,
Abstract
This study centers on a statistical analysis of the licensing time, construction time, and capital cost of light water reactor power plants. The use of these econometric techniques allows the major cost driving variables to be identified through multivariate analysis of time series data on over 50 U.S. nuclear power plants. The analysis made in the study provides a clearer picture of the dynamic changes that have occurred in the cost of these power plants than does engineering cost estimates, and produces a tool that can be used to project LWR costs. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1980
- Accession Number
- ADA093751
Entities
People
- William E. Mooz
Organizations
- RAND Corporation