Prompton Lake Condition Report Dam, Outlet Works & Spillway, Periodic Inspection Report Number 2, July 1971, Lackawaxan River Basin, Lackawaxan River, Pennsylvania.

Abstract

This report describes the Prompton Lake project, sets schedules for inspections, describes in detail the instrumentation installed and evaluation of the data gathered in the inspection of Prompton Lake during 21 July 1971. Piezometer data and a conduit settlement study for outlet works were also reported. It was found that the project is considered in overall good condition with adequate instrumentation to measure performance of the dam during operation. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1971
Accession Number
ADA094252

Entities

Organizations

  • Philadelphia District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Construction
  • Department Of Defense
  • Drainage Basins
  • Earth Fills
  • Embankments
  • Engineering
  • Engineers
  • Excavation
  • Flood Control
  • Floods
  • Groundwater
  • Instrumentation
  • Materials
  • Measurement
  • Piezometers
  • Riprap

Readers

  • Aerospace Test and Evaluation
  • Facility/Structural Engineering.
  • Riverine Ecology