Prompton Lake Condition Report Dam, Outlet Works & Spillway, Periodic Inspection Report Number 2, July 1971, Lackawaxan River Basin, Lackawaxan River, Pennsylvania.
Abstract
This report describes the Prompton Lake project, sets schedules for inspections, describes in detail the instrumentation installed and evaluation of the data gathered in the inspection of Prompton Lake during 21 July 1971. Piezometer data and a conduit settlement study for outlet works were also reported. It was found that the project is considered in overall good condition with adequate instrumentation to measure performance of the dam during operation. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1971
- Accession Number
- ADA094252
Entities
Organizations
- Philadelphia District, U.S. Army Corps of Engineers