Electronic Joint Army/Navy Point Detonating/Delay Fuze
Abstract
This report describes work done and achievements made towards the completion of the program objectives. The Requirements Definition, Subsystem Development, Theoretical Analysis, System Integration, and the Reliability Analysis are discussed with an explanation of Fuze operation included in the System Integration section. The conclusion includes a summary of the effort done and recommendations for further work. The requirements for the JAN PD/Delay Fuze are outlined. The Navy and Army Fuze requirements are similar except for weight, setback arming level, spin arming level and arming distance. The different weight requirements require separate Navy and Army penetrators, while the different setback spin and arming distance requirements can be met during assembly with minimal part substitution and a jumper select option.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 30, 1980
- Accession Number
- ADA094284
Entities
People
- Alan Wendler
- Wade Williams
Organizations
- Honeywell International, Inc.