OMB A-76: Full Costing and Its Impact at Installation Level within the U.S. Army.
Abstract
This thesis evaluates the methods for accumulating costs attributable to the overhead pools of an Army in-house estimate for Government performance of Commercial or Industrial Type Activities (CITA). The full costing requirements of Office of Management and Budget (OMB A-76) of March 1979 is investigated vis-a-vis its impact at the installation level within the Army. Initial discussion addresses the evolution of the comparative cost analysis as a basis for in-house operation of a CITA function and explores the guidance provided by OMB, the Department of Defense, and the Department of the Army (DA). The concept of 'full cost' was reviewed as used by private industry. A case was developed around Government contractors, and nonprofit organizations. A major DA installation was used to illustrate the cost accumulation process and sources of cost data available to a typical DA installation. It was concluded that collection of relevant cost data to support CITA cost analysis was unnecessarily tedious and time consuming; and two steps were recommended to improve this process. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1980
- Accession Number
- ADA094550
Entities
People
- Grant G. Hintze
Organizations
- Naval Postgraduate School