Chief Joseph Dam, Columbia River, Washington, Community Impact Reports,

Abstract

This report consolidates four studies concerning economic and social community impacts related to construction activities at a hydropower dam in a rural area. Coverage is from preproject conditions and impact projections to a period of peak construction activity when projections were verified. Methodology for projecting number and place of residence of workers and related population is presented. Techniques for estimating capacity of community utilities and services is explained. Details are provided on mitigation methods to alleviate impacts to public schools. An indepth survey and analysis of the construction work force provides data on worker profiles and construction-related population. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1980
Accession Number
ADA094932

Entities

People

  • Arthur A. Harnisch
  • Kathryn G. Carssow
  • Margaret A. Hadaway
  • William R. Burton

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Birds
  • Business Administration
  • Drainage Basins
  • Economic Development
  • Employment
  • Environmental Protection
  • Families (Human)
  • Groundwater
  • Health Services
  • Law
  • Medical Personnel
  • Personnel Management
  • Recreation
  • Therapy
  • Urban Areas
  • Waste Disposal Facilities
  • Water Resources

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Industrial Economics
  • Systems Analysis and Design