St. Lawrence Seaway N.Y. Feasibility Study for Additional Locks and Other Navigation Improvements: Plan of Study. Revision.
Abstract
This revised plan of study has been prepared to comply with the Stage I planning requirements for a feasibility level study. The material draws heavily upon secondary sources of published information from Federal, State and local agencies. Forecasts of future traffic, estimates of existing lock capacity and related analytical documents were used in the preparation of the Revised Plan of Study. The material in this study reflects estimates of study variables as of June 1979. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1979
- Accession Number
- ADA095082
Entities
Organizations
- United States Army Corps of Engineers