Marine Seismic System Deployment (MSS). Phase 2. Investigation of Techniques and Deployment Scenarios for Installation of Triaxial Seismometer in a Borehole in the Deep Ocean

Abstract

This report presents the results of the Phase II detail design and planning effort oriented primarily toward the initial Marine Seismic System (MSS) At-Sea-Test scheduled for March 1981. The At-Sea-Test operations will be conducted using the Deep Sea Drilling Project (DSDP) drillship GLOMAR CHALLENGER for an estimated period of six days. The overall MSS deployment program plan and associated costs est. has been upgraded to reflect the emplacement of two boreholes, and the deployment of one configuration I BIP system in the North Pacific during the period of June-July 1982.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 09, 1981
Accession Number
ADA095678

Entities

People

  • Robert L. Wallerstedt

Tags

Communities of Interest

  • Engineered Resilient Systems
  • Ground and Sea Platforms
  • Sensors

DTIC Thesaurus Topics

  • Computational Science
  • Drops
  • Dynamic Loads
  • Engineers
  • Freight Transportation
  • Geometry
  • Measurement
  • Mechanical Working
  • Mechanics
  • Plastic Explosives
  • Reliability
  • Seabed
  • Surface Transportation
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • United States

Fields of Study

  • Environmental science

Readers

  • Oceanography.
  • Seismology