Detailed Test Plan for Validation of Close Air Support (CAS). Phase II Results
Abstract
The purpose of the Detailed Test Plan (DTP) is to outline the procedures and methods for conduct of the Close Air Support (CAS) validation program in reducing uncertainties of the command and control portion of the JCS Phase II Study of CAS. The Data Collection Plan, Test Plan Concept, additional JCS guidance and the Individual Test Plans for specific exercises, were used in developing this plan. Emphasis has been placed on collection of quantitative data for ten of eleven JCS specified objectives in eight selected training exercises.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1973
- Accession Number
- ADA096199