Prove Out of Automated Assembly Line for M564 Delay Arming Mechanisms by Acquisition of 40,000 Units Assembled by Automated Line.

Abstract

This contract calls for the manufacture of 40,000 Delay Arming Mechanisms (DAMs) and to prove out the automated line. Inasmuch as the contractor has many years of experience in Government contracting, there was no need to dwell on the routine aspects of the portion of DD form 1484 dealing with contract administration. However, a number of points were discussed as being candidates for clarification and/or contract modification.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 22, 1981
Accession Number
ADA096588

Tags

Communities of Interest

  • Advanced Electronics
  • Human Systems
  • Sensors

DTIC Thesaurus Topics

  • Assembly
  • Assembly Lines
  • Contract Administration
  • Contractors
  • Contracts
  • Control Systems Engineering
  • Debugging
  • Engineering
  • Engineers
  • Indicator Lights
  • Industrial Engineering
  • Machines
  • Manufacturing
  • Manufacturing Engineering
  • Production
  • Quality Control
  • Test Equipment

Readers

  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Government Contracting/Procurement.
  • Theoretical Analysis.