Presque Isle Peninsula, Erie, Pennsylvania. Volume I. Main Report. Revised.
Abstract
The design memorandum study investigates several alternatives for the preservation of Presque Isle Peninsula and its recreational facilities from natural erosion processes with the least amount of damage to its natural geological and ecological processes. The overall organization of this report consists of a Main Report, a Plate Appendix, a series of Technical Appendices, a Pertinent Correspondence Appendix, and a Public Involvement and Coordination Appendix. The Main Report is written to give both the general and technical reader a clear understanding of the study, the study results, and the basis for key decisions and conclusions. The Main Report provides a summary of the planning processes carried out for a reformulation Phase I General Design Memorandum investigation. The Plate Appendix includes all the plates developed for this report for easy reference. The Technical Appendices provide additional detailed information on the design and costs and benefits of the alternatives investigated and a material survey of construction materials. The Pertinent Correspondence Appendix includes correspondence pertinent to the accomplishment of the project. The Public Involvement and Coordination Appendix contains correspondence documenting public involvement and coordination during this Phase I Design Memorandum investigation.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1980
- Accession Number
- ADA097490
Entities
Organizations
- United States Army Corps of Engineers