Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam.

Abstract

This study investigated hydroelectric development at Mines Falls Dam in Nashua New Hampshire. Reinstallation of hydroelectric power at Mines Falls Dam has been determined feasible. Two hydroelectric development plans were looked at in detail: (1) hydroelectric development at the dam site, (2) development along the canal about one mile downstream of the dam. Development at the dam was determined to be the most practical and feasible as it would not disturb the delicate canal system. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1980
Accession Number
ADA097753

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Birds
  • Construction
  • Drainage Basins
  • Electric Generators
  • Electric Power
  • Energy Production
  • Environment
  • Environmental Protection
  • Fish
  • Fisheries
  • Habitats
  • Hydropower
  • Law
  • New England
  • New Hampshire
  • United States
  • Wildlife

Readers

  • Hydraulic Engineering.
  • Hydrologic Risk Analysis and Mitigation.
  • Systems Analysis and Design