One densified billet out of each 36 processed is randomly selected and subjected to the Production Lot Sampling Tests specified in paragraph 5.2.3 of the Equipment Test Plan, AVSD-0115-80-CR dated 4 April 1980. This particular PLS (5) was taken from General Electric Densification Lot number 6. The ten nosetip assemblies delivered under the subject contract were taken from this lot. All of the test results obtained were within specification limits and there are no anomalies to be reported. All data has been compiled on previously presented Figures 7, 8, and 9 from the Equipment Test Plan, and included herein as the General Test Report, Production Lot Sampling, in accordance with CRDL Sequence Number 081A2.