Worldwide Crisis Alerting Network, Phase II. Task 1. Review of Related Work,

Abstract

Chapter One of this report is as an introduction to the results of our Task 1 effort: Review of Related Work. Chapter Two contains the primary deliverable for Task 1 of the contract, the statement of prior completion. In addition, the method of conducting the Task 1 literature review is described and a summary table of applicable documents is provided. The abstracts of these documents are found in Appendixes A through J. Appendix K contains a list of documents which have been ordered and will be reviewed upon receipt. If any of these documents are found to be applicable, an addendum to the Task 1 report will be issued. Appendix L to this report contains listings of information requests used to conduct the Defense Documentation Center (DDC) portion of the review. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1980
Accession Number
ADA098641

Entities

People

  • H. P. Himpler
  • J. F. Holmes

Organizations

  • ARINC

Tags

Communities of Interest

  • Space

DTIC Thesaurus Topics

  • Artificial Satellites
  • Bibliographies
  • Coast Guard
  • Communication Systems
  • Computer Science
  • Contractors
  • Contracts
  • Corporations
  • Governments
  • Literature Surveys
  • Organizational Structure
  • Satellite Communications
  • Security
  • Space Systems
  • Standards
  • Telephone Systems
  • United States

Readers

  • Instructional Design and Training Evaluation.
  • Library and Information Science