GREAT II Upper Mississippi River (Guttenberg, Iowa to Saverton, Missouri). Plan Formulation Addendum

Abstract

The purpose of this appendix is to provide a document that details the GREAT II plan formulation process. Essentially, the entire appendix represents this process. However, data and information developed through the GREAT II process are included as reference materials. The GREAT II plan formulation process came to an end when the draft GREAT II reports were published in May, 1980. The responsibilities of the Plan Formulation Work Group and the 12 functional work groups were absolved. The Team (based on public and agency comments), revised the GREAT II recommended plan. The results of Team activities are contained in the GREAT II Main Report and two supplements to the Main Report: (1) the Channel Maintenance Handbook and (2) the Environmental Report. Therefore, Team activities are not discussed in this appendix, except where necessary to provide continuity.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1980
Accession Number
ADA099648

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Cells
  • Environmental Protection
  • Fish
  • Fisheries
  • Flood Control
  • Habitats
  • Medical Personnel
  • Wildlife

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering