National Dam Safety Program. Upper Keswick Dam (NJ-00047), Atlantic Coastal Basin, Wrangel Brook, Ocean County, New Jersey. Phase I Inspection Report.
Abstract
Upper Keswich Dam is an earthfill dam with a paved roadway along the crest and a concrete capped timber drop inlet as a spillway. The overall condition of the dam is good. There are no major signs of distress or instability in the embankment. Minor seepage was observed at three different locations along the downstream toe. One location was to the left of the downstream channel and the others at each end of the dam. The low-level outlet was not open at the inspection and is not used. The hazard potential is rated as 'high'. Upper Keswick Dam is considered inadequate in view of its lack of spillway capacity to pass the SDF (1/2 PMF) without overtopping the dam. The spillway is capable of passing a flood equal to 21 percent of the PMF (42 percent of the 1/2 PMF), and is assessed as 'inadequate'. At present, the engineering data available is not sufficient to make a definitive statement on the stability of the dam, but based on the findings of the visual inspection, the preliminary assessment of static stability is that it is satisfactory.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1981
- Accession Number
- ADA099670
Entities
People
- John P. Talerico
Organizations
- New Jersey Department of Environmental Protection