Los Angeles International Airport Data Package Number 7. Airport Improvement Task Force Delay Studies.

Abstract

This report is data package 7 for review by the Task Force members. The Stage 1 experiments have been re-worked since the last meeting in November and reflect the latest comments of the group. Attachment A is a list of the Stage 1 and Stage 2 experiments. The Stage 1 experiments (attachment B) are arranged in sets to illustrate various comparisons requested by the Task Force members. VRF and IFR weather conditions have been separated along with each configuration (westerly, easterly, and night time operations). Each experiment contains a description of the objective, the runway configuration, the related experiments and a summary of the results. A link node diagram is included to illustrate the airfield changes noted in the experiment.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1979
Accession Number
ADA099883

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Aircrafts
  • Airports
  • Attachment
  • International Airports
  • Landing Fields
  • New Jersey
  • Plastic Explosives
  • Task Forces
  • Transportation

Readers

  • Aerospace logistics and air mobility.
  • Aviation Science / Aeronautics.
  • Business Analytics