Descriptive Summaries of the Research Development Test & Evaluation Army Appropriation FY 1982. Supporting Data FY 1982, Budget Estimate Submitted to Congress January 1981 (Amended 30 April 1981). Volume II.

Abstract

Volume II contains a descriptive summary for each program element to be financed during FY 1982. Descriptive Summaries for projects within the program elements to be financed during FY 1982 for $5.0 million or more appear immediately following the applicable program element. Where there are several items under development within a project, a separate summary has been provided for each item that exceeds $5.0 million during FY 1982. A Test and Evaluation Section is provided for all major weapon systems. Major weapon systems are identified by an asterisk in the Table of Contents. The attached Descriptive Summaries have the FY 1980 column restructured to reflect more realistic historical information. Procurement data is shown where applicable for items in engineering or operational development. Military construction data is shown where applicable. Programs discussed in Volume II are: Strategic Programs; and Tactical Programs.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1981
Accession Number
ADA101306

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Cyber
  • Electronic Warfare
  • Ground and Sea Platforms
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircraft Equipment
  • Airframes
  • Contingency Operations (Military)
  • Fire Control Systems
  • Military Science
  • Munitions Testing
  • Ordnance Laboratories
  • Propelling Charges
  • Test And Evaluation
  • Warning Systems
  • Weapon Control
  • Weapons Effects

Readers

  • Public Financial Management and Budgeting
  • Software Engineering