Buffalo Metropolitan Area, New York Water Resources Management Study, Tonawanda Creek Watershed. Interim Flood Management Study. Appendices.

Abstract

The purpose of the Tonawanda Creek Watershed, N.Y., Flood Management Feasibility Study is to develop and evaluate alternative plans to provide for flood and flood-related management needs in the Tonawanda Creek Watershed. In accordance with Corps policy, this study has been accomplished in two phases. During the first phase, all significant flood and flood-related management needs in the Tonawanda Creek Watershed were identified. Then measures to provide for those needs were identified and appraised. These measures were considered alone, and in combination, in development of alternate plans. The alternate plans were then evaluated and those which appeared viable were recommended for further study. During the second phase, those plans recommended for further study, and alternate plans introduced following completion of the first phase, were evaluated, and the optimum plan has been recommended for implementation. This report presents the findings of the second phase of study. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1980
Accession Number
ADA101439

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Birds
  • Fish
  • Habitats
  • Medical Personnel
  • Poultry
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Systems Analysis and Design