Cattaraugus Creek Harbor, New York General Design Memorandum. Phase II. (Detailed Design). Volume II. Appendix E. Littoral Processes and Sedimentation in the Cattaraugus Embayment, New York. Appendix F. Sediment Transport in Cattaraugus Creek.

Abstract

The purpose of this Phase 2 General Design Memorandum is to present the detailed design of the Cattaraugus Harbor improvements. This report describes the changes in the local cooperation requirements, costs, and benefits that have accrued due to changes in design and price levels since preparation of the Phase 1 General Design Memorandum. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1976
Accession Number
ADA102282

Entities

Organizations

  • State University of New York

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Coastal Engineering
  • Drainage Basins
  • Drops
  • Engineers
  • Environment
  • Flood Control
  • Geography
  • Geometry
  • Great Lakes
  • Measurement
  • New York
  • Photographs
  • Plastic Explosives
  • Ridges
  • Topography
  • Wave Power

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Systems Analysis and Design