Interim Report on Feasibility of Improving Recreation Access and Related Water and Land Management in the Buffalo Metropolitan Area, New York.

Abstract

This final feasibility report is one of four studies that comprise the Buffalo Metropolitan Area Study. The other three studies are concerned with flood management in Cayuga, Cazenovia, and Tonawanda Creek Watersheds. This study report identifies a practical development plan for improved access, fishing, and recreational opportunity in the Buffalo Metropolitan Area and along the Niagara Riverfront. The study has considered several areas including the Niagara River which is a largely underdeveloped natural resource immediately adjacent to a large urban population. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1979
Accession Number
ADA102434

Entities

Organizations

  • Buffalo District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Birds
  • Environmental Protection
  • Fish
  • Fisheries
  • Flood Control
  • Habitats
  • Medical Personnel
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering