Geneva-on-the-Lake, Ohio. Small-Boat Harbor. Final Reformulation. Phase I. General Design Memorandum and Final Environmental Impact Statement.
Abstract
This report recommends that a small-boat harbor and harbor-of-refuge and recreational fishing facilities be constructed as an integral part of the State Park at Geneva-on-the-Lake, OH, and that the selected plan of improvement, known as Alternative Plan 3b, (Modified Wetland/Parking Lot Harbor) be used as a basis for the Phase II General Design Memorandum. The total first cost of the project, on August 1981 price levels, is a $5,816,000 consisting of: $2,870,000 Corps of Engineers; $76,000 U.S. Coast Guard; and $2,870,000 non-Federal. These recommendations are made with the understanding that non-Federal interests must furnish assurances satisfactory to the Secretary of the Army with regard to 15 listed provisos.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1981
- Accession Number
- ADA104866
Entities
Organizations
- Buffalo District, U.S. Army Corps of Engineers