National Dam Safety Program. Ellis Lake Dam (MO 31067), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report.

Abstract

Ellis Lake Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the combined spillways do not meet the criteria set forth in the guidelines for a dam of its size and hazard potential. The combined spillways will pass 13 percent of the Probable Maximum Flood without overtopping. The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The guidelines require that a dam of small size with a high downstream hazard potential pass 50 to 100 percent of the PMF. Considering the low height of the dam and the small storage capacity, 50 percent of the PMF has been determined to be the appropriate spillway design flood. The 1 percent probability flood will not overtop the dam. The 1 percent probability flood is one that has a 1 percent chance of being exceeded in any given year.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1981
Accession Number
ADA105355

Entities

People

  • Dave Daniels
  • Gene Wertepny
  • Steve Brady
  • Tom Beckley

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Aerial Photographs
  • Civil Engineering
  • Computer Programs
  • Computers
  • Construction
  • Contractors
  • Dams
  • Department Of Defense
  • Drainage Basins
  • Engineering
  • Engineers
  • Geography
  • Groundwater
  • Photographs
  • United States
  • Valleys
  • Visual Inspection

Readers

  • Hydrologic Risk Analysis and Mitigation.