National Dam Safety Program. Lake Front Royal Dam (Inventory Number VA 18705), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report.

Abstract

Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillway will pass 15 percent of the Probable Maximum Flood (PMF) or 30 percent of the SDF without overtopping the dam. During the SDF, the dam will be overtopped by a maximum of .4 ft for a period of 4 hours at a maximum velocity of 2.7 fps. Flows overtopping the dam during the SDF are not considered detrimental to the embankment with respect to erosion. The spillway is judged inadequate, but not seriously inadequate. The visual inspection revealed no apparent problems, however, two saturated areas encountered on the downstream embankment slope above the toe are concern. An evaluation of the stability condition could not be made since there is insufficient design and construction data for this structure.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1981
Accession Number
ADA106324

Entities

People

  • Carl S. Anderson Jr.
  • Jack G. Starr
  • Ray E. Martin

Tags

Communities of Interest

  • Human Systems
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Classification
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Plains
  • Floods
  • Geotechnical Engineering
  • Inspection
  • Safety
  • United States
  • Valleys
  • Virginia
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.