RIW Workshop Report

Abstract

A reliability improvement warranty (RIW) workshop was convened on 9- 10- December 1980 at the MITRE Corporation, Bedford, Mass., to explore the feasibility of RIW for current and future production JTIDS (Joint Tactical Information Distribution System) contracts. In particular, RIW suitability for the Class I JTIDS production buy was discussed. The concensus of the group was that RIW is not appropriate for the Class 1 production buy, but that it can be useful on other programs including Class 2 JTIDS if certain conditions are met and the RIW contract is tailored to the program. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1981
Accession Number
ADA108798

Entities

People

  • Sidney A. Greenberg
  • Walter P. Crossley

Organizations

  • MITRE Corporation

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Aircrafts
  • Computations
  • Configuration Management
  • Contractors
  • Contracts
  • Engineering
  • Failure Mode And Effect Analysis
  • Life Cycle Costs
  • Life Cycles
  • Logistics
  • Maintenance
  • Maintenance Personnel
  • Procurement
  • Terminals
  • Test And Evaluation

Readers

  • Electronics Engineering
  • Facility/Structural Engineering.
  • Instructional Design and Training Evaluation.