National Dam Safety Program. Nanticoke Creek Watershed Project-Floodwater Retarding Dam Site 9-C (Inventory Number N.Y. 628), Susquehanna River Basin, Broome County, New York. Phase I Inspection Report,

Abstract

This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Based on the evaluation of the existing conditions, the condition of the Nanticoke Creek Watershed Project - Floodwater Retarding Dam Site 9-C is considered to be good. The examination of documents and visual observations did not reveal conditions which consitute a hazard to human life or property. The spillway capacity was evaluated according to the recommended procedure and was found to pass the required spillway design flood of 100 percent of the Probable Maximum Flood (PMF). Therefore, the spillway capacity is rated to be adequate. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1981
Accession Number
ADA109781

Entities

People

  • Lawrence D. Andersen

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Agriculture
  • Classification
  • Computer Programs
  • Concrete
  • Construction
  • Drainage Basins
  • Engineering
  • Engineers
  • Materials
  • Materials Testing
  • Mechanics
  • New York
  • Slope Stability
  • Soil Mechanics
  • Test And Evaluation
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.