Investigation of Alternative Methods Including Jackknifing for Estimating Point Availability of a System.
Abstract
Properties of two alternative procedures to the Jackknife Point and Confidence Interval Estimation Procedure of Gaver and Chu have been studied. They are called the Log-Normal Likelihood Procedure (LNLJ) and the Moment Procedure (MP). These two procedures were investigated and compared with the Jackknife Point and Confidence Interval Availability Estimation Procedure. Numerical results from simulations are presented in this report. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1981
- Accession Number
- ADA110532
Entities
People
- Barbaros Aba
Organizations
- Naval Postgraduate School