National Software Works Tool Integration Studies
Abstract
This final technical report documents the following specific activities of the subject contract: (1) Review of the NSW project organizational structure, including roles, responsibilities and contractor assignments, (2) Description of the NSW development process. (3) Survey of the NSW system architecture and user functionality, (4) Establishment of the current operational status of NSW including the chronology of major events, and finally (5) Serve as an introductory NSW tutorial for new users.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1981
- Accession Number
- ADA111317
Entities
People
- Normand Rasmussen