TRESTLE Pulser Improvement Study.
Abstract
This report documents theoretical efforts undertaken to determine the engineering feasibility of design modifications suggested for the purpose of improving the performance of the existing pulse generator system used in the TRESTLE facility. A test plan is outlined for the evaluation of these modifications, and approximate costs are given for the modifications. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1981
- Accession Number
- ADA111507