Marine Corps Field Logistics System. Appendix A. Equipment Status
Abstract
To develop the Field Logistics System (FLS) Master Implementation Plan requires a review of the status of each FLS item and its associated FLS dependencies, an identification of the equipment it is to replace, and a determination of when replacement should occur. To accomplish this, the methodology employed was to: Identify each item of the FLS; Identify the existing equipment which will be replaced; Determine the development status of each FLS item and its impact on total system implementation; Determine the availability of each item for procurement; Determine the quantity of FLS items required to effectively replace existing assets; Project production unit costs; Determine existing asset age, life cycle, and future useful life; and Recommend the phase-out or disposal of existing assets and introduction of FLS items. This methodology formed the basis for the equipment data baseline used in development of the various plans required for system implementation. This report describes each of the FLS items and provides a detailed informational status of each element as collected to date.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1980
- Accession Number
- ADA112080