System Engineering Analysis of Liquid Cargo Handling System Installed on AO-177, AOE-1, and AOR-1 Class Ships,
Abstract
The analysis documented herein is specifically applicable to the Liquid Cargo Handling System (LCHS), ship's work authorization boundaries (SWAB) groups 544-1 and 544-2 installed on A0-177, A0E-1, and A0R-1 Class ships. It considers only the systems and equipments installed and documentation effective as of 30 Sept. 1981. This system was selected for analysis by PERA (CSS) on the basis of its mission criticality and historical maintenance burden.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1982
- Accession Number
- ADA114723
Entities
People
- Joseph C. Yancy Jr
Organizations
- ARINC