Deepening and Extending Channels for Navigation. Charleston Harbor, South Carolina.

Abstract

This report recommends deepening the existing Charleston and Shipyard River Project, to 40 and 38 feet respectively. Some additional basin and channel widening is also recommended. Ocean disposal was the most viable means of disposing of the dredged material. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1980
Accession Number
ADA115715

Entities

Organizations

  • Charleston District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Birds
  • Environment
  • Environmental Protection
  • Habitats
  • Liquid Phases
  • Water Resources
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering