Feasibility Report. Mississippi River at Saint Paul, Minnesota. Reevaluation of Saint Paul Flood Control Project.

Abstract

The St. Paul flood control project was completed in 1964 to protect one of the main industrial areas of the city from flooding of the Mississippi River. Riverview Industrial Park, the area protected by the project, has undergone extensive development ranging from manufacturing plants to commercial establishments and financial institutions. Since development of the project, St. Paul experience major floods in 1965 and 1969, both of which exceeded the previous record flood in 1952. The purpose of this study is to determine the present needs for flood control in the project area and whether the project meets those needs. The specific study area consists of the lands, buildings, and improvements protected by the existing flood barrier. This report contains recommendations on the economic feasibility, environmental acceptability, and advisability of modifying the project or its operation due to changed economic and hydrologic conditions. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1981
Accession Number
ADA116378

Entities

Organizations

  • St. Paul District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Birds
  • Construction
  • Environment
  • Environmental Protection
  • Flood Control
  • Flood Damage
  • Flood Hazards
  • Geography
  • Groundwater
  • Habitats
  • Health Services
  • Lepidoptera
  • Medical Personnel
  • Pumping Stations
  • Transportation
  • Water Resources
  • Wildlife

Readers

  • Industrial Economics
  • Riverine Ecology
  • Systems Analysis and Design