General Design Memorandum. Phase I and Environmental Impact Statement for Flood Control and Related Purposes, Sheyenne River, North Dakota.
Abstract
The selected plan would consist of a levee and diversion at West Fargo/ Riverside; diversion from West Fargo to Horace; a 5-foot raise of Baldhill Dam. Fish rearing ponds and a hatchery building downstream of the dam would have to be replaced. About 140 acres of woodland and 125 acres of grassland would be required to compensate for the Dead Colt Creek tributary dam. Final mitigation requirements would be the responsibility of other agencies. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1982
- Accession Number
- ADA119482
Entities
Organizations
- St. Paul District, U.S. Army Corps of Engineers