IEMCAP Analysis of the XM-1 Tank.
Abstract
This report concludes the results obtained during the IEMCAP Analysis of the XM-1 Tank Project. The period covered was 29 January 1981 to 24 April 1982. The major effort consisted of applying the Intrasystem Electromagnetic Compatibility Analysis Program (IEMCAP) to the analysis of the XM-1 tank, identification of problem areas and limitations of IEMCAP, XM-1 system definition, data requirements and an IEMCAP input data sensitivity analysis. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1982
- Accession Number
- ADA119866
Entities
People
- Donald R. Pflug Jr.
- Mildred K. Bartley
- Thomas E. Baldwin Jr.
Organizations
- ARCO