Wynoochee Hydropower/Fish Hatchery: Feasibility Report and Environmental Impact Statement.
Abstract
Presents results of a feasibility study on the desirability of developing the hydropower potential and fish enhancement opportunities at Wynoochee Dam, Washington. Recommended plan is an 11.3 megawatt hydropower addition which would produce an average 36,900 megawatt hours energy per year and a 405,000 - pound hatchery for anadromous fish which would add 127,500 adult fish to the annual harvest. Investment cost would be $43,410,000 (October 1981) of which $23,420,000 is for the hydropower facility and $19,990,000 for the hatchery. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 1982
- Accession Number
- ADA120049
Entities
People
- James O. Waller
Organizations
- United States Army Corps of Engineers