Environmental Impact Statement. Flood Control, Burlington Dam, Souris River, North Dakota. Biological Assessment and Section 404(b) Evaluation.
Abstract
Because of extensive modifications to the proposed project, the EIS for Burlington Dam of January 1975 was updated by one dated January 1978. This EIS proposed a dam near Burlington, a raise of Lake Darling Dam, a diversion tunnel, and downstream levee improvements. This supplement includes a biological assessment which addresses the impacts of all currently listed threatened or endangered species and an evaluation of the fill activities associated with the proposal and its alternatives. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1979
- Accession Number
- ADA120128
Entities
Organizations
- St. Paul District, U.S. Army Corps of Engineers