Operation and Maintenance, Savannah Harbor, Georgia.
Abstract
The proposed calls for removal of 7 million cubic yards of dredged material annually from Savannah Harbor. This operation requires the deposition of approximately 6 million cubic yards from the inner harbor in existing disposal areas; and approximately 1 million cubic yards from the bar channel in an open ocean disposal site. Adverse environmental impacts include temporary increase in turbidity and loss of plankton and benthic organisms temporarily during dredging.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1976
- Accession Number
- ADA120795
Entities
Organizations
- Savannah District, U.S. Army Corps of Engineers