Flood Control Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Design Memorandum Number 8. Part I. Location Study and Draft Supplement II to the Final Environmental Impact Statement for Bridge Relocations. Main Street, Trunk Highways 60 Bridge over the Minnesota River between Mankato and North Mankato.

Abstract

The St. Paul District is constructing flood control works on the Minnesota and Blue Earth Rivers to protect developed portions of Mankato, North Mankato and Le Hillier lying in the floodplain from frequent flood damage. The Main Street bridge over the Minnesota must be raised or replaced to an elevation approximately 30 feet above the existing bridge to clear the railroad on the Mankato side. Two plans were selected for detailed study. The tentatively selected plan 1CA would begin in North Mankato on Belgrade Ave. at the same location as the existing bridge and connect to Mulberry Street one block north of Main Street. Adverse neighborhood impacts would be most severe in Mankato. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1981
Accession Number
ADA120868

Entities

Organizations

  • St. Paul District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Construction
  • Economic Development
  • Environment
  • Environmental Protection
  • Fish
  • Flood Control
  • Floods
  • Habitats
  • Health Services
  • Law
  • Medical Personnel
  • Natural Resources
  • Plastic Explosives
  • United States
  • Urban Areas
  • Water Resources
  • Wildlife

Readers

  • Facility/Structural Engineering.
  • Riverine Ecology