Flood Control Minnesota River, Minnesota, Minnesota, Mankato-North Mankato-Le Hillier, Design Memorandum Number 8. Part I. Location Study and Draft Supplement II to the Final Environmental Impact Statement for Bridge Relocations. Chicago and Northwestern Transportation Company Bridges Over the Blue Earth River between Mankato and Le Hillier.

Abstract

The St. Paul District is constructing flood control works on the Minnesota and Blue Earth Rivers to protect developed portions of Mankato, North Mankato and Le Hillier lying in the floodplain from frequent flood damage. The two Chicago and North Western Transportation Company bridges over the Blue Earth River must be raised approximately eight feet. The three plans seriously considered would eliminate one bride used for only car storage and would relocate the main track downstream adjacent to the existing bridges. The tentatively selected plan 3B would provide for all car storage on two stub-end tracks east of the river adjacent to the Honeymead plant.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1981
Accession Number
ADA120872

Entities

Organizations

  • St. Paul District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Construction
  • Cost Estimates
  • Economic Development
  • Engineering
  • Environment
  • Environmental Health
  • Environmental Protection
  • Flood Control
  • Groundwater
  • Habitats
  • Natural Resources
  • Plastic Explosives
  • Riprap
  • Transportation
  • United States
  • Water Resources
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Facility/Structural Engineering.