GPS/IGS Design Analysis Report. Volume 1
Abstract
The validation test has verified that the SPL IGS/GPS operates as specified without impact to the basic GPS navigation mission. The test program involved integration and testing of the complete SPL IGS system installed on the GPS vehicle. Anechoic chamber tests were run with both payloads operating and with all transmitters operating at full power. No detectable cross coupling of transmitter/receiver combinations was observed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 15, 1982
- Accession Number
- ADA122373