Hydropower Study. Blackwater Dam, Webster, New Hampshire.
Abstract
The principal thrust of this limited reconnaissance effort is to determine whether any economically feasible hydropower development could be undertaken at Blackwater Dam. Baseline environmental, recreational, social and cultural conditions in the study area have been identified. Due to time and funding limitations only two alternatives were considered. If the study is continued several alternatives will be evaluated.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1981
- Accession Number
- ADA122574
Entities
Organizations
- New England District, U.S. Army Corps of Engineers