Assessment of the Flood Problems of the Taunton River Basin Massachusetts.
Abstract
Purpose of study is to investigate the flooding problems and other water resources needs within the Taunton River Basin and to develop a plan of improvements for resolving these problems. The selected plan includes regulatory measures only. Includes findings of a reconnaissance study which indicated those portions of the basin which are prone to urbanization and have greatest impact on increasing flood runoff. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1978
- Accession Number
- ADA122993
Entities
Organizations
- New England District, U.S. Army Corps of Engineers